
133 - Deep Dive on That Pesky Transition: Top-of-Foundation/Bottom-of-Above-Grade Wall
Failed to add items
Sorry, we are unable to add the item because your shopping cart is already at capacity.
Add to basket failed.
Please try again later
Add to Wish List failed.
Please try again later
Remove from Wish List failed.
Please try again later
Follow podcast failed
Unfollow podcast failed
-
Narrated by:
-
By:
About this listen
Should exterior above-grade wall sheathing or framing line up flush to the outside face of the foundation? Is sealing the bottom of the above-grade wall and foundation with a sill sealer product like Protecto Wrap Triple Guard a good idea? This sets off Jake, Steve, and Pete on balancing water protection, air sealing, and drying potential at this key transition and challenges for control layer continuity. Finally, Steve gets TMI with his sleeping arrangements with his wife...
PETE'S RESOURCES:
- Protecto Wrap Triple Guard
- NOTE: It is interesting that in their installation drawing, the framed wall is stepped out to line up the framing with the foundation, but they do not lap the sheathing down over the foundation.
- Huber ZIP Sheathing bottom-of-above grade-wall Detail(s)
- NOTE: 4 details with "Scenario 4" being spot on for the UnBuild It guys...
- Above-Grade Concrete Foundation Waterproofing
What listeners say about 133 - Deep Dive on That Pesky Transition: Top-of-Foundation/Bottom-of-Above-Grade Wall
Average Customer RatingsReviews - Please select the tabs below to change the source of reviews.
In the spirit of reconciliation, Audible acknowledges the Traditional Custodians of country throughout Australia and their connections to land, sea and community. We pay our respect to their elders past and present and extend that respect to all Aboriginal and Torres Strait Islander peoples today.