
Production HQ & The Greenscreen Room
Failed to add items
Add to basket failed.
Add to Wish List failed.
Remove from Wish List failed.
Follow podcast failed
Unfollow podcast failed
-
Narrated by:
-
By:
About this listen
I’ve been asked more than once — if anything can go wrong at any time when making a movie, why even make a plan? My answer is simple: I make the plan because anything can go wrong at any time. In this episode of the Lethal Voice Podcast, I take you inside the third installment of Chapter 3: Lockdown Productions — where our Gardena apartment doubled as headquarters, accommodations, and even a greenscreen studio for some of the wildest sequences in Vengeance Turns: Volume Two.
You’ll hear me talk honestly about casting chaos, compromises, and the night I told producer Dave Ross to “eff or walk.” You’ll also hear from Dave himself in an interview clip where he explains his side of the story.
As always, this is my confessional — where I share what went right, what went wrong, and why I kept pushing forward when it all could have fallen apart.
🎥 Links I mention in this episode:
- Welcome Matt (my first amateur feature, 2009) → [link]
- Episode 10 – 48 Hour Telethon & The First Day → [link]
- Episode One of Chapter One of the Lethal Voice Podcast → [link]
- Upcoming slasher/thriller SPREAD: Pigs to Slaughter → https://spreadthemovie.com
My first theatrical premiere is October 30, 2025 at Regal NoHo — check the site above for details and tickets.
Support the show
Vengeance Turns: Volume One and Two streaming FREE now on Tubi
Grab the free comic + see exclusive content from Vengeance Turns and ALL my projects: Procrastagram.com
Rate, share, and share your lethal voice.