Kingman Road Maintenance Scheduled
Failed to add items
Add to basket failed.
Add to Wish List failed.
Remove from Wish List failed.
Follow podcast failed
Unfollow podcast failed
-
Narrated by:
-
By:
About this listen
Send us a text and chime in!
The City of Kingman will begin crack sealing operations on Monday, March 2, 2026, along Hualapai Mountain Road from Central Street to the Kingman city limits as part of its ongoing Pavement Preservation Program. Work is anticipated to continue throughout the week, with crews operating daily from 7:00 a.m. to 4:00 p.m. Motorists should expect lane closures and detours between Seneca Street and Central Street during this time. Traffic control measures will be in place to help guide drivers safely through the work zone. Crack sealing is a proactive maintenance strategy designed to prevent water from penetrating the roadway surface,...
For the written story, read here >> https://www.signalsaz.com/articles/kingman-road-maintenance-scheduled/
Check out the CAST11.com Website at: https://CAST11.com
Follow the CAST11 Podcast Network on Facebook at: https://Facebook.com/CAST11AZ
Follow Cast11 Instagram at: https://www.instagram.com/cast11_podcast_network