Episode 8: Case Study: Vague Drawings and Contracts cover art

Episode 8: Case Study: Vague Drawings and Contracts

Episode 8: Case Study: Vague Drawings and Contracts

Listen for free

View show details

About this listen

Optometry owners often assume that once drawings are complete, their project is ready for construction — but this case study shows how misleading that assumption can be. In a major remodel, an optometrist received drawings that appeared complete but lacked essential engineering, specifications, and phasing details, resulting in contractor bids ranging from $850k to $1.8M.
Art and Hailee walk through why incomplete plans create financial risk, how vague contracts expose owners to delays and change orders, and what optometrists should confirm before moving forward with any build-out or renovation.

Topics include:
• Identifying when drawings “look complete” but aren’t buildable
• How open lighting, flooring, and equipment specs lead to inflated pricing
• Why detailed MEPs are non-negotiable for controlling budget and scope
• What to look for in a construction contract before you sign
• How proper planning protects your timeline, shutdown schedule, and long-term costs

No reviews yet
In the spirit of reconciliation, Audible acknowledges the Traditional Custodians of country throughout Australia and their connections to land, sea and community. We pay our respect to their elders past and present and extend that respect to all Aboriginal and Torres Strait Islander peoples today.